![JUNO – Paints manufacturers since 1927](https://www.junopaints.com/assets/media/JUNO-simbolo-solo.jpg)
Brush, roller or spraying. Always apply in thin, well-stretched coats.
Thin the first coat with 20-30% thinner. Thin second coat with 5% thinner.
Once the pool is painted, minimum 15 days must have passed before the pool is re-filled with water.
For more information Consult TDS.